source_record_id string | country_iso3 string | country_name string | source_sheet string | d_13 float64 | kisiizi_hospital_power string | column string | column_2 string | column_3 string | column_4 string | d_0_3 float64 | d_0_36 float64 | d_0_36_2 float64 | d_0_36_3 float64 | d_0_36_4 float64 | source_period_start_year int64 | source_period_end_year int64 | source_period_label string | source_provider string | source_dataset string | source_resource string | source_package_id string | source_resource_id string | source_url string | license_id string | retrieved_at string |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
ubos-stat-ed6c5af0b1bc2d:installed-capacity:0 | UGA | Uganda | Installed_Capacity | 14 | Rwimi | null | null | null | null | null | 5.54 | 5.54 | 5.54 | 5.54 | 2,014 | 2,022 | 2014-2022 | Uganda Bureau of Statistics | Installed Electricity Capacity in Mega Watts (2014 to 2021) | Installed Electricity Capacity in Mega Watts (2014 to 2021) | installed-electricity-capacity-in-mega-watts-2014-to-2021-ubos-stat-ed6c5af0b1bc | ubos-stat-ed6c5af0b1bc2d | https://www.ubos.org/wp-content/uploads/statistics/Installed_Electricity_Capacity_in_MW_2014_2021.xls | other-open | 2026-07-21T21:37:51Z |
ubos-stat-ed6c5af0b1bc2d:installed-capacity:1 | UGA | Uganda | Installed_Capacity | 15 | Nyamwamba | null | null | null | null | null | 9.2 | 9.2 | 9.2 | 9.2 | 2,014 | 2,022 | 2014-2022 | Uganda Bureau of Statistics | Installed Electricity Capacity in Mega Watts (2014 to 2021) | Installed Electricity Capacity in Mega Watts (2014 to 2021) | installed-electricity-capacity-in-mega-watts-2014-to-2021-ubos-stat-ed6c5af0b1bc | ubos-stat-ed6c5af0b1bc2d | https://www.ubos.org/wp-content/uploads/statistics/Installed_Electricity_Capacity_in_MW_2014_2021.xls | other-open | 2026-07-21T21:37:51Z |
ubos-stat-ed6c5af0b1bc2d:installed-capacity:2 | UGA | Uganda | Installed_Capacity | 16 | Lubilia | null | null | null | null | null | 5.4 | 5.4 | 5.4 | 5.4 | 2,014 | 2,022 | 2014-2022 | Uganda Bureau of Statistics | Installed Electricity Capacity in Mega Watts (2014 to 2021) | Installed Electricity Capacity in Mega Watts (2014 to 2021) | installed-electricity-capacity-in-mega-watts-2014-to-2021-ubos-stat-ed6c5af0b1bc | ubos-stat-ed6c5af0b1bc2d | https://www.ubos.org/wp-content/uploads/statistics/Installed_Electricity_Capacity_in_MW_2014_2021.xls | other-open | 2026-07-21T21:37:51Z |
ubos-stat-ed6c5af0b1bc2d:installed-capacity:3 | UGA | Uganda | Installed_Capacity | 17 | Nkusi | null | null | null | null | null | 9.6 | 9.6 | 9.6 | 9.6 | 2,014 | 2,022 | 2014-2022 | Uganda Bureau of Statistics | Installed Electricity Capacity in Mega Watts (2014 to 2021) | Installed Electricity Capacity in Mega Watts (2014 to 2021) | installed-electricity-capacity-in-mega-watts-2014-to-2021-ubos-stat-ed6c5af0b1bc | ubos-stat-ed6c5af0b1bc2d | https://www.ubos.org/wp-content/uploads/statistics/Installed_Electricity_Capacity_in_MW_2014_2021.xls | other-open | 2026-07-21T21:37:51Z |
ubos-stat-ed6c5af0b1bc2d:installed-capacity:4 | UGA | Uganda | Installed_Capacity | 18 | Mahoma Hydro | null | null | null | null | null | 2.7 | 2.7 | 2.7 | 2.7 | 2,014 | 2,022 | 2014-2022 | Uganda Bureau of Statistics | Installed Electricity Capacity in Mega Watts (2014 to 2021) | Installed Electricity Capacity in Mega Watts (2014 to 2021) | installed-electricity-capacity-in-mega-watts-2014-to-2021-ubos-stat-ed6c5af0b1bc | ubos-stat-ed6c5af0b1bc2d | https://www.ubos.org/wp-content/uploads/statistics/Installed_Electricity_Capacity_in_MW_2014_2021.xls | other-open | 2026-07-21T21:37:51Z |
ubos-stat-ed6c5af0b1bc2d:installed-capacity:5 | UGA | Uganda | Installed_Capacity | 19 | Waki HPP | null | null | null | null | null | 4.8 | 4.8 | 4.8 | 4.8 | 2,014 | 2,022 | 2014-2022 | Uganda Bureau of Statistics | Installed Electricity Capacity in Mega Watts (2014 to 2021) | Installed Electricity Capacity in Mega Watts (2014 to 2021) | installed-electricity-capacity-in-mega-watts-2014-to-2021-ubos-stat-ed6c5af0b1bc | ubos-stat-ed6c5af0b1bc2d | https://www.ubos.org/wp-content/uploads/statistics/Installed_Electricity_Capacity_in_MW_2014_2021.xls | other-open | 2026-07-21T21:37:51Z |
ubos-stat-ed6c5af0b1bc2d:installed-capacity:6 | UGA | Uganda | Installed_Capacity | 20 | Swam** | null | null | null | null | null | 0.04 | 0 | 0 | 0 | 2,014 | 2,022 | 2014-2022 | Uganda Bureau of Statistics | Installed Electricity Capacity in Mega Watts (2014 to 2021) | Installed Electricity Capacity in Mega Watts (2014 to 2021) | installed-electricity-capacity-in-mega-watts-2014-to-2021-ubos-stat-ed6c5af0b1bc | ubos-stat-ed6c5af0b1bc2d | https://www.ubos.org/wp-content/uploads/statistics/Installed_Electricity_Capacity_in_MW_2014_2021.xls | other-open | 2026-07-21T21:37:51Z |
ubos-stat-ed6c5af0b1bc2d:installed-capacity:7 | UGA | Uganda | Installed_Capacity | 21 | Bwindi** | null | null | null | null | null | 0.064 | 0.064 | 0.064 | 0 | 2,014 | 2,022 | 2014-2022 | Uganda Bureau of Statistics | Installed Electricity Capacity in Mega Watts (2014 to 2021) | Installed Electricity Capacity in Mega Watts (2014 to 2021) | installed-electricity-capacity-in-mega-watts-2014-to-2021-ubos-stat-ed6c5af0b1bc | ubos-stat-ed6c5af0b1bc2d | https://www.ubos.org/wp-content/uploads/statistics/Installed_Electricity_Capacity_in_MW_2014_2021.xls | other-open | 2026-07-21T21:37:51Z |
ubos-stat-ed6c5af0b1bc2d:installed-capacity:8 | UGA | Uganda | Installed_Capacity | 22 | Isimba | null | null | null | null | null | null | 183 | 183 | 183 | 2,014 | 2,022 | 2014-2022 | Uganda Bureau of Statistics | Installed Electricity Capacity in Mega Watts (2014 to 2021) | Installed Electricity Capacity in Mega Watts (2014 to 2021) | installed-electricity-capacity-in-mega-watts-2014-to-2021-ubos-stat-ed6c5af0b1bc | ubos-stat-ed6c5af0b1bc2d | https://www.ubos.org/wp-content/uploads/statistics/Installed_Electricity_Capacity_in_MW_2014_2021.xls | other-open | 2026-07-21T21:37:51Z |
ubos-stat-ed6c5af0b1bc2d:installed-capacity:9 | UGA | Uganda | Installed_Capacity | 23 | Sindila (Butama) | null | null | null | null | null | null | 5.25 | 5.25 | 5.25 | 2,014 | 2,022 | 2014-2022 | Uganda Bureau of Statistics | Installed Electricity Capacity in Mega Watts (2014 to 2021) | Installed Electricity Capacity in Mega Watts (2014 to 2021) | installed-electricity-capacity-in-mega-watts-2014-to-2021-ubos-stat-ed6c5af0b1bc | ubos-stat-ed6c5af0b1bc2d | https://www.ubos.org/wp-content/uploads/statistics/Installed_Electricity_Capacity_in_MW_2014_2021.xls | other-open | 2026-07-21T21:37:51Z |
ubos-stat-ed6c5af0b1bc2d:installed-capacity:10 | UGA | Uganda | Installed_Capacity | 24 | Siti II Small Hydro Power | null | null | null | null | null | null | 16.5 | 16.5 | 16.5 | 2,014 | 2,022 | 2014-2022 | Uganda Bureau of Statistics | Installed Electricity Capacity in Mega Watts (2014 to 2021) | Installed Electricity Capacity in Mega Watts (2014 to 2021) | installed-electricity-capacity-in-mega-watts-2014-to-2021-ubos-stat-ed6c5af0b1bc | ubos-stat-ed6c5af0b1bc2d | https://www.ubos.org/wp-content/uploads/statistics/Installed_Electricity_Capacity_in_MW_2014_2021.xls | other-open | 2026-07-21T21:37:51Z |
ubos-stat-ed6c5af0b1bc2d:installed-capacity:11 | UGA | Uganda | Installed_Capacity | 25 | Ziba Limited (Kyambura) | null | null | null | null | null | null | 7.6 | 7.6 | 7.6 | 2,014 | 2,022 | 2014-2022 | Uganda Bureau of Statistics | Installed Electricity Capacity in Mega Watts (2014 to 2021) | Installed Electricity Capacity in Mega Watts (2014 to 2021) | installed-electricity-capacity-in-mega-watts-2014-to-2021-ubos-stat-ed6c5af0b1bc | ubos-stat-ed6c5af0b1bc2d | https://www.ubos.org/wp-content/uploads/statistics/Installed_Electricity_Capacity_in_MW_2014_2021.xls | other-open | 2026-07-21T21:37:51Z |
ubos-stat-ed6c5af0b1bc2d:installed-capacity:12 | UGA | Uganda | Installed_Capacity | 26 | Ndugutu HPP | null | null | null | null | null | null | 5.9 | 5.9 | 5.9 | 2,014 | 2,022 | 2014-2022 | Uganda Bureau of Statistics | Installed Electricity Capacity in Mega Watts (2014 to 2021) | Installed Electricity Capacity in Mega Watts (2014 to 2021) | installed-electricity-capacity-in-mega-watts-2014-to-2021-ubos-stat-ed6c5af0b1bc | ubos-stat-ed6c5af0b1bc2d | https://www.ubos.org/wp-content/uploads/statistics/Installed_Electricity_Capacity_in_MW_2014_2021.xls | other-open | 2026-07-21T21:37:51Z |
ubos-stat-ed6c5af0b1bc2d:installed-capacity:13 | UGA | Uganda | Installed_Capacity | 27 | Achwa 2 | null | null | null | null | null | null | 42 | 42 | 42 | 2,014 | 2,022 | 2014-2022 | Uganda Bureau of Statistics | Installed Electricity Capacity in Mega Watts (2014 to 2021) | Installed Electricity Capacity in Mega Watts (2014 to 2021) | installed-electricity-capacity-in-mega-watts-2014-to-2021-ubos-stat-ed6c5af0b1bc | ubos-stat-ed6c5af0b1bc2d | https://www.ubos.org/wp-content/uploads/statistics/Installed_Electricity_Capacity_in_MW_2014_2021.xls | other-open | 2026-07-21T21:37:51Z |
ubos-stat-ed6c5af0b1bc2d:installed-capacity:14 | UGA | Uganda | Installed_Capacity | 28 | Timex Bukinda | null | null | null | null | null | null | null | 6.5 | 6.5 | 2,014 | 2,022 | 2014-2022 | Uganda Bureau of Statistics | Installed Electricity Capacity in Mega Watts (2014 to 2021) | Installed Electricity Capacity in Mega Watts (2014 to 2021) | installed-electricity-capacity-in-mega-watts-2014-to-2021-ubos-stat-ed6c5af0b1bc | ubos-stat-ed6c5af0b1bc2d | https://www.ubos.org/wp-content/uploads/statistics/Installed_Electricity_Capacity_in_MW_2014_2021.xls | other-open | 2026-07-21T21:37:51Z |
ubos-stat-ed6c5af0b1bc2d:installed-capacity:15 | UGA | Uganda | Installed_Capacity | null | Thermal Electricity | 100 | 136 | 136 | 136 | 136.08 | 101.68 | 101.08 | 101.08 | 101.68 | 2,014 | 2,022 | 2014-2022 | Uganda Bureau of Statistics | Installed Electricity Capacity in Mega Watts (2014 to 2021) | Installed Electricity Capacity in Mega Watts (2014 to 2021) | installed-electricity-capacity-in-mega-watts-2014-to-2021-ubos-stat-ed6c5af0b1bc | ubos-stat-ed6c5af0b1bc2d | https://www.ubos.org/wp-content/uploads/statistics/Installed_Electricity_Capacity_in_MW_2014_2021.xls | other-open | 2026-07-21T21:37:51Z |
ubos-stat-ed6c5af0b1bc2d:installed-capacity:16 | UGA | Uganda | Installed_Capacity | 29 | Electromax | 50 | 86 | 86 | 86 | 86 | 50 | 50 | 50 | 50 | 2,014 | 2,022 | 2014-2022 | Uganda Bureau of Statistics | Installed Electricity Capacity in Mega Watts (2014 to 2021) | Installed Electricity Capacity in Mega Watts (2014 to 2021) | installed-electricity-capacity-in-mega-watts-2014-to-2021-ubos-stat-ed6c5af0b1bc | ubos-stat-ed6c5af0b1bc2d | https://www.ubos.org/wp-content/uploads/statistics/Installed_Electricity_Capacity_in_MW_2014_2021.xls | other-open | 2026-07-21T21:37:51Z |
ubos-stat-ed6c5af0b1bc2d:installed-capacity:17 | UGA | Uganda | Installed_Capacity | 30 | Jacobsen Plant - Namanve | 50 | 50 | 50 | 50 | 50 | 50 | 50 | 50 | 50 | 2,014 | 2,022 | 2014-2022 | Uganda Bureau of Statistics | Installed Electricity Capacity in Mega Watts (2014 to 2021) | Installed Electricity Capacity in Mega Watts (2014 to 2021) | installed-electricity-capacity-in-mega-watts-2014-to-2021-ubos-stat-ed6c5af0b1bc | ubos-stat-ed6c5af0b1bc2d | https://www.ubos.org/wp-content/uploads/statistics/Installed_Electricity_Capacity_in_MW_2014_2021.xls | other-open | 2026-07-21T21:37:51Z |
ubos-stat-ed6c5af0b1bc2d:installed-capacity:18 | UGA | Uganda | Installed_Capacity | 31 | WENRECO - Thermal** | null | null | null | null | null | 1.6 | 0 | 0 | 0 | 2,014 | 2,022 | 2014-2022 | Uganda Bureau of Statistics | Installed Electricity Capacity in Mega Watts (2014 to 2021) | Installed Electricity Capacity in Mega Watts (2014 to 2021) | installed-electricity-capacity-in-mega-watts-2014-to-2021-ubos-stat-ed6c5af0b1bc | ubos-stat-ed6c5af0b1bc2d | https://www.ubos.org/wp-content/uploads/statistics/Installed_Electricity_Capacity_in_MW_2014_2021.xls | other-open | 2026-07-21T21:37:51Z |
ubos-stat-ed6c5af0b1bc2d:installed-capacity:19 | UGA | Uganda | Installed_Capacity | 32 | Kisiizi Hospital Power** | - | - | - | - | 0.08 | 0.08 | 0.08 | 0.08 | 0.08 | 2,014 | 2,022 | 2014-2022 | Uganda Bureau of Statistics | Installed Electricity Capacity in Mega Watts (2014 to 2021) | Installed Electricity Capacity in Mega Watts (2014 to 2021) | installed-electricity-capacity-in-mega-watts-2014-to-2021-ubos-stat-ed6c5af0b1bc | ubos-stat-ed6c5af0b1bc2d | https://www.ubos.org/wp-content/uploads/statistics/Installed_Electricity_Capacity_in_MW_2014_2021.xls | other-open | 2026-07-21T21:37:51Z |
ubos-stat-ed6c5af0b1bc2d:installed-capacity:20 | UGA | Uganda | Installed_Capacity | 33 | Kalangala Infrastructure Services**- | null | - | - | - | 1 | 1 | 1 | 1 | 1.6 | 2,014 | 2,022 | 2014-2022 | Uganda Bureau of Statistics | Installed Electricity Capacity in Mega Watts (2014 to 2021) | Installed Electricity Capacity in Mega Watts (2014 to 2021) | installed-electricity-capacity-in-mega-watts-2014-to-2021-ubos-stat-ed6c5af0b1bc | ubos-stat-ed6c5af0b1bc2d | https://www.ubos.org/wp-content/uploads/statistics/Installed_Electricity_Capacity_in_MW_2014_2021.xls | other-open | 2026-07-21T21:37:51Z |
ubos-stat-ed6c5af0b1bc2d:installed-capacity:21 | UGA | Uganda | Installed_Capacity | null | *Bagasse Electricity | 36 | 54 | 64.5 | 64.5 | 76.4 | 96.2 | 96.2 | 96.2 | 111.7 | 2,014 | 2,022 | 2014-2022 | Uganda Bureau of Statistics | Installed Electricity Capacity in Mega Watts (2014 to 2021) | Installed Electricity Capacity in Mega Watts (2014 to 2021) | installed-electricity-capacity-in-mega-watts-2014-to-2021-ubos-stat-ed6c5af0b1bc | ubos-stat-ed6c5af0b1bc2d | https://www.ubos.org/wp-content/uploads/statistics/Installed_Electricity_Capacity_in_MW_2014_2021.xls | other-open | 2026-07-21T21:37:51Z |
ubos-stat-ed6c5af0b1bc2d:installed-capacity:22 | UGA | Uganda | Installed_Capacity | 34 | Kakira Sugar Limited | 32 | 50 | 50 | 50 | 50 | 51.1 | 51.1 | 51.1 | 51.1 | 2,014 | 2,022 | 2014-2022 | Uganda Bureau of Statistics | Installed Electricity Capacity in Mega Watts (2014 to 2021) | Installed Electricity Capacity in Mega Watts (2014 to 2021) | installed-electricity-capacity-in-mega-watts-2014-to-2021-ubos-stat-ed6c5af0b1bc | ubos-stat-ed6c5af0b1bc2d | https://www.ubos.org/wp-content/uploads/statistics/Installed_Electricity_Capacity_in_MW_2014_2021.xls | other-open | 2026-07-21T21:37:51Z |
ubos-stat-ed6c5af0b1bc2d:installed-capacity:23 | UGA | Uganda | Installed_Capacity | 35 | Kinyara Sugar Works Limited | 4 | 4 | 14.5 | 14.5 | 14.5 | 14.5 | 14.5 | 14.5 | 14.5 | 2,014 | 2,022 | 2014-2022 | Uganda Bureau of Statistics | Installed Electricity Capacity in Mega Watts (2014 to 2021) | Installed Electricity Capacity in Mega Watts (2014 to 2021) | installed-electricity-capacity-in-mega-watts-2014-to-2021-ubos-stat-ed6c5af0b1bc | ubos-stat-ed6c5af0b1bc2d | https://www.ubos.org/wp-content/uploads/statistics/Installed_Electricity_Capacity_in_MW_2014_2021.xls | other-open | 2026-07-21T21:37:51Z |
ubos-stat-ed6c5af0b1bc2d:installed-capacity:24 | UGA | Uganda | Installed_Capacity | 36 | Sugar and Allied Uganda Limited | - | - | - | - | 11.9 | 11.9 | 11.9 | 11.9 | 11.9 | 2,014 | 2,022 | 2014-2022 | Uganda Bureau of Statistics | Installed Electricity Capacity in Mega Watts (2014 to 2021) | Installed Electricity Capacity in Mega Watts (2014 to 2021) | installed-electricity-capacity-in-mega-watts-2014-to-2021-ubos-stat-ed6c5af0b1bc | ubos-stat-ed6c5af0b1bc2d | https://www.ubos.org/wp-content/uploads/statistics/Installed_Electricity_Capacity_in_MW_2014_2021.xls | other-open | 2026-07-21T21:37:51Z |
ubos-stat-ed6c5af0b1bc2d:installed-capacity:25 | UGA | Uganda | Installed_Capacity | 37 | SCOUL | null | null | null | null | null | 9.5 | 9.5 | 9.5 | 25 | 2,014 | 2,022 | 2014-2022 | Uganda Bureau of Statistics | Installed Electricity Capacity in Mega Watts (2014 to 2021) | Installed Electricity Capacity in Mega Watts (2014 to 2021) | installed-electricity-capacity-in-mega-watts-2014-to-2021-ubos-stat-ed6c5af0b1bc | ubos-stat-ed6c5af0b1bc2d | https://www.ubos.org/wp-content/uploads/statistics/Installed_Electricity_Capacity_in_MW_2014_2021.xls | other-open | 2026-07-21T21:37:51Z |
ubos-stat-ed6c5af0b1bc2d:installed-capacity:26 | UGA | Uganda | Installed_Capacity | 38 | Mayuge Sugar Limited | null | null | null | null | null | 9.2 | 9.2 | 9.2 | 9.2 | 2,014 | 2,022 | 2014-2022 | Uganda Bureau of Statistics | Installed Electricity Capacity in Mega Watts (2014 to 2021) | Installed Electricity Capacity in Mega Watts (2014 to 2021) | installed-electricity-capacity-in-mega-watts-2014-to-2021-ubos-stat-ed6c5af0b1bc | ubos-stat-ed6c5af0b1bc2d | https://www.ubos.org/wp-content/uploads/statistics/Installed_Electricity_Capacity_in_MW_2014_2021.xls | other-open | 2026-07-21T21:37:51Z |
ubos-stat-ed6c5af0b1bc2d:installed-capacity:27 | UGA | Uganda | Installed_Capacity | null | Solar PV | 0 | 0 | 0 | 0 | 17.6 | 40.83 | 50.83 | 60.83 | 61.83 | 2,014 | 2,022 | 2014-2022 | Uganda Bureau of Statistics | Installed Electricity Capacity in Mega Watts (2014 to 2021) | Installed Electricity Capacity in Mega Watts (2014 to 2021) | installed-electricity-capacity-in-mega-watts-2014-to-2021-ubos-stat-ed6c5af0b1bc | ubos-stat-ed6c5af0b1bc2d | https://www.ubos.org/wp-content/uploads/statistics/Installed_Electricity_Capacity_in_MW_2014_2021.xls | other-open | 2026-07-21T21:37:51Z |
ubos-stat-ed6c5af0b1bc2d:installed-capacity:28 | UGA | Uganda | Installed_Capacity | 39 | Access Solar | - | - | - | - | 8.5 | 10 | 10 | 10 | 10 | 2,014 | 2,022 | 2014-2022 | Uganda Bureau of Statistics | Installed Electricity Capacity in Mega Watts (2014 to 2021) | Installed Electricity Capacity in Mega Watts (2014 to 2021) | installed-electricity-capacity-in-mega-watts-2014-to-2021-ubos-stat-ed6c5af0b1bc | ubos-stat-ed6c5af0b1bc2d | https://www.ubos.org/wp-content/uploads/statistics/Installed_Electricity_Capacity_in_MW_2014_2021.xls | other-open | 2026-07-21T21:37:51Z |
ubos-stat-ed6c5af0b1bc2d:installed-capacity:29 | UGA | Uganda | Installed_Capacity | 40 | Tororo Solar North | - | - | - | - | 8.5 | 10 | 10 | 10 | 10 | 2,014 | 2,022 | 2014-2022 | Uganda Bureau of Statistics | Installed Electricity Capacity in Mega Watts (2014 to 2021) | Installed Electricity Capacity in Mega Watts (2014 to 2021) | installed-electricity-capacity-in-mega-watts-2014-to-2021-ubos-stat-ed6c5af0b1bc | ubos-stat-ed6c5af0b1bc2d | https://www.ubos.org/wp-content/uploads/statistics/Installed_Electricity_Capacity_in_MW_2014_2021.xls | other-open | 2026-07-21T21:37:51Z |
ubos-stat-ed6c5af0b1bc2d:installed-capacity:30 | UGA | Uganda | Installed_Capacity | 41 | MSS Xsabo Solar Power Limited | null | null | null | null | null | 20 | 20 | 20 | 20 | 2,014 | 2,022 | 2014-2022 | Uganda Bureau of Statistics | Installed Electricity Capacity in Mega Watts (2014 to 2021) | Installed Electricity Capacity in Mega Watts (2014 to 2021) | installed-electricity-capacity-in-mega-watts-2014-to-2021-ubos-stat-ed6c5af0b1bc | ubos-stat-ed6c5af0b1bc2d | https://www.ubos.org/wp-content/uploads/statistics/Installed_Electricity_Capacity_in_MW_2014_2021.xls | other-open | 2026-07-21T21:37:51Z |
ubos-stat-ed6c5af0b1bc2d:installed-capacity:31 | UGA | Uganda | Installed_Capacity | 42 | Absolute-Kitobo | null | null | null | null | null | 0.23 | 0.23 | 0.23 | 0.23 | 2,014 | 2,022 | 2014-2022 | Uganda Bureau of Statistics | Installed Electricity Capacity in Mega Watts (2014 to 2021) | Installed Electricity Capacity in Mega Watts (2014 to 2021) | installed-electricity-capacity-in-mega-watts-2014-to-2021-ubos-stat-ed6c5af0b1bc | ubos-stat-ed6c5af0b1bc2d | https://www.ubos.org/wp-content/uploads/statistics/Installed_Electricity_Capacity_in_MW_2014_2021.xls | other-open | 2026-07-21T21:37:51Z |
ubos-stat-ed6c5af0b1bc2d:installed-capacity:32 | UGA | Uganda | Installed_Capacity | 43 | Kalangala Infrastructure Services**- | null | - | - | - | 0.6 | 0.6 | 0.6 | 0.6 | 1.6 | 2,014 | 2,022 | 2014-2022 | Uganda Bureau of Statistics | Installed Electricity Capacity in Mega Watts (2014 to 2021) | Installed Electricity Capacity in Mega Watts (2014 to 2021) | installed-electricity-capacity-in-mega-watts-2014-to-2021-ubos-stat-ed6c5af0b1bc | ubos-stat-ed6c5af0b1bc2d | https://www.ubos.org/wp-content/uploads/statistics/Installed_Electricity_Capacity_in_MW_2014_2021.xls | other-open | 2026-07-21T21:37:51Z |
ubos-stat-ed6c5af0b1bc2d:installed-capacity:33 | UGA | Uganda | Installed_Capacity | 44 | Emerging Power U Ltd (Mayuge/Bufulubi) | null | null | null | null | null | null | 10 | 10 | 10 | 2,014 | 2,022 | 2014-2022 | Uganda Bureau of Statistics | Installed Electricity Capacity in Mega Watts (2014 to 2021) | Installed Electricity Capacity in Mega Watts (2014 to 2021) | installed-electricity-capacity-in-mega-watts-2014-to-2021-ubos-stat-ed6c5af0b1bc | ubos-stat-ed6c5af0b1bc2d | https://www.ubos.org/wp-content/uploads/statistics/Installed_Electricity_Capacity_in_MW_2014_2021.xls | other-open | 2026-07-21T21:37:51Z |
ubos-stat-ed6c5af0b1bc2d:installed-capacity:34 | UGA | Uganda | Installed_Capacity | 45 | Tororo PV Power Project (Tororo PV Power Co. Ltd) | null | null | null | null | null | null | null | 10 | 10 | 2,014 | 2,022 | 2014-2022 | Uganda Bureau of Statistics | Installed Electricity Capacity in Mega Watts (2014 to 2021) | Installed Electricity Capacity in Mega Watts (2014 to 2021) | installed-electricity-capacity-in-mega-watts-2014-to-2021-ubos-stat-ed6c5af0b1bc | ubos-stat-ed6c5af0b1bc2d | https://www.ubos.org/wp-content/uploads/statistics/Installed_Electricity_Capacity_in_MW_2014_2021.xls | other-open | 2026-07-21T21:37:51Z |
ubos-stat-ed6c5af0b1bc2d:installed-capacity:35 | UGA | Uganda | Installed_Capacity | null | Biomass | 0 | 0 | 0 | 0 | 0 | 0.043 | 0.043 | 0.043 | 0.043 | 2,014 | 2,022 | 2014-2022 | Uganda Bureau of Statistics | Installed Electricity Capacity in Mega Watts (2014 to 2021) | Installed Electricity Capacity in Mega Watts (2014 to 2021) | installed-electricity-capacity-in-mega-watts-2014-to-2021-ubos-stat-ed6c5af0b1bc | ubos-stat-ed6c5af0b1bc2d | https://www.ubos.org/wp-content/uploads/statistics/Installed_Electricity_Capacity_in_MW_2014_2021.xls | other-open | 2026-07-21T21:37:51Z |
ubos-stat-ed6c5af0b1bc2d:installed-capacity:36 | UGA | Uganda | Installed_Capacity | 46 | Pamoja-Tiribogo | null | null | null | null | null | 0.032 | 0.032 | 0.032 | 0.032 | 2,014 | 2,022 | 2014-2022 | Uganda Bureau of Statistics | Installed Electricity Capacity in Mega Watts (2014 to 2021) | Installed Electricity Capacity in Mega Watts (2014 to 2021) | installed-electricity-capacity-in-mega-watts-2014-to-2021-ubos-stat-ed6c5af0b1bc | ubos-stat-ed6c5af0b1bc2d | https://www.ubos.org/wp-content/uploads/statistics/Installed_Electricity_Capacity_in_MW_2014_2021.xls | other-open | 2026-07-21T21:37:51Z |
ubos-stat-ed6c5af0b1bc2d:installed-capacity:37 | UGA | Uganda | Installed_Capacity | 47 | Pamoja-Ssekanyonyi | null | null | null | null | null | 0.011 | 0.011 | 0.011 | 0.011 | 2,014 | 2,022 | 2014-2022 | Uganda Bureau of Statistics | Installed Electricity Capacity in Mega Watts (2014 to 2021) | Installed Electricity Capacity in Mega Watts (2014 to 2021) | installed-electricity-capacity-in-mega-watts-2014-to-2021-ubos-stat-ed6c5af0b1bc | ubos-stat-ed6c5af0b1bc2d | https://www.ubos.org/wp-content/uploads/statistics/Installed_Electricity_Capacity_in_MW_2014_2021.xls | other-open | 2026-07-21T21:37:51Z |
ubos-stat-ed6c5af0b1bc2d:installed-capacity:38 | UGA | Uganda | Installed_Capacity | null | ** Off grid generator | null | null | null | null | null | null | null | null | null | 2,014 | 2,022 | 2014-2022 | Uganda Bureau of Statistics | Installed Electricity Capacity in Mega Watts (2014 to 2021) | Installed Electricity Capacity in Mega Watts (2014 to 2021) | installed-electricity-capacity-in-mega-watts-2014-to-2021-ubos-stat-ed6c5af0b1bc | ubos-stat-ed6c5af0b1bc2d | https://www.ubos.org/wp-content/uploads/statistics/Installed_Electricity_Capacity_in_MW_2014_2021.xls | other-open | 2026-07-21T21:37:51Z |
ubos-stat-ed6c5af0b1bc2d:installed-capacity:39 | UGA | Uganda | Installed_Capacity | null | Source: Electricity Regulatory Authority | null | null | null | null | null | null | null | null | null | 2,014 | 2,022 | 2014-2022 | Uganda Bureau of Statistics | Installed Electricity Capacity in Mega Watts (2014 to 2021) | Installed Electricity Capacity in Mega Watts (2014 to 2021) | installed-electricity-capacity-in-mega-watts-2014-to-2021-ubos-stat-ed6c5af0b1bc | ubos-stat-ed6c5af0b1bc2d | https://www.ubos.org/wp-content/uploads/statistics/Installed_Electricity_Capacity_in_MW_2014_2021.xls | other-open | 2026-07-21T21:37:51Z |
Installed Electricity Capacity in Mega Watts (2014 to 2021) | Africa (Uganda official open data)
40 rows - 1 Africa country - 2014-2022 - Repackaged by Electric Sheep Africa
TL;DR
This dataset packages one official XLS resource from Uganda as
ML-ready Parquet. The source file is the provenance boundary; all usable
indicators or tabular columns from the resource stay together in this repo.
About the source
- Source: Installed Electricity Capacity in Mega Watts (2014 to 2021)
- Publisher: Uganda Bureau of Statistics
- Resource: Installed Electricity Capacity in Mega Watts (2014 to 2021)
- Format:
XLS - License: Other open license
- Packaging mode:
tabular_resource
Geographic coverage
1 Africa country:
| Country | Rows | First year | Last year | Name |
|---|---|---|---|---|
UGA |
40 | 2014 | 2022 | Uganda |
Indicators or Resource Contents
- This source file is packaged as a normalized tabular resource.
Schema
| Column | Type | Description | Example |
|---|---|---|---|
source_record_id |
string |
Stable row identifier for tabular resources. | ubos-stat-ed6c5af0b1bc2d:installed-capacity:0 |
country_iso3 |
string |
ISO3 country code. | UGA |
country_name |
string |
Country name. | Uganda |
source_sheet |
string |
Workbook sheet name, when the source is a spreadsheet. | Installed_Capacity |
d_13 |
float64 |
Source column. | 14.0 |
kisiizi_hospital_power |
string |
Source column. | Rwimi |
column |
string |
Source column. | `` |
column_2 |
string |
Source column. | `` |
column_3 |
string |
Source column. | `` |
column_4 |
string |
Source column. | `` |
d_0_3 |
float64 |
Source column. | `` |
d_0_36 |
float64 |
Source column. | 5.54 |
d_0_36_2 |
float64 |
Source column. | 5.54 |
d_0_36_3 |
float64 |
Source column. | 5.54 |
d_0_36_4 |
float64 |
Source column. | 5.54 |
source_period_start_year |
Int64 |
First year inferred from source resource metadata. | 2014 |
source_period_end_year |
Int64 |
Last year inferred from source resource metadata. | 2022 |
source_period_label |
string |
Human-readable period inferred from source resource metadata. | 2014-2022 |
source_provider |
string |
Publishing organization. | Uganda Bureau of Statistics |
source_dataset |
string |
Source package title. | Installed Electricity Capacity in Mega Watts (2014 to 2021) |
source_resource |
string |
Source resource title. | Installed Electricity Capacity in Mega Watts (2014 to 2021) |
source_package_id |
string |
CKAN package UUID. | installed-electricity-capacity-in-mega-watts-2014-to-2021-ubos-stat-ed6c |
source_resource_id |
string |
CKAN resource UUID. | ubos-stat-ed6c5af0b1bc2d |
source_url |
string |
Original source resource URL. | https://www.ubos.org/wp-content/uploads/statistics/Installed_Electricity |
license_id |
string |
Source license identifier. | other-open |
retrieved_at |
string |
UTC retrieval timestamp. | 2026-07-21T21:37:51Z |
Usage
from datasets import load_dataset
ds = load_dataset("electricsheepafrica/africa-uganda-installed-electricity-capacity-in-mega-watts-2014-to-2021-7fea7780")
df = ds["train"].to_pandas()
print(df.head())
Filter to one country
sample_country = df[df["country_iso3"] == "UGA"]
Work with indicators
if "indicator_id" in df.columns:
print(df["indicator_id"].value_counts().head())
sample = df.sort_values([c for c in ["indicator_id", "year"] if c in df.columns])
Citation
@misc{electric_sheep_africa_africa_uganda_installed_electricity_capacity_in_mega_watts_2014_to_2021_7fea7780_2022,
title = {Installed Electricity Capacity in Mega Watts (2014 to 2021) | Africa (Uganda official open data)},
author = {Uganda Bureau of Statistics},
year = {2022},
url = {https://www.ubos.org/explore-statistics/0/},
publisher = {HuggingFace Datasets, repackaged by Electric Sheep Africa},
howpublished = {\url{https://huggingface.co/datasets/electricsheepafrica/africa-uganda-installed-electricity-capacity-in-mega-watts-2014-to-2021-7fea7780}}
}
License
Released under Other open license.
Original data (c) Uganda Bureau of Statistics. When using this dataset, please cite both the original source above and the Electric Sheep Africa repackaging.
About Electric Sheep
Electric Sheep Africa is part of the Electric Sheep mission: a unified,
ML-ready data layer for Africa on Hugging Face. We pull data from authoritative
open sources, normalize the schemas, package as Parquet, and publish with
consistent dataset cards so researchers and developers can use load_dataset()
to start working in seconds.